Upgrade Kit 12-15/16 long leads IEC

Diagnostic ECG Patient Cables and Leads

Find similar products

Long Upgrade Kit banana posts shielded 12-15/16 leads IEC color coded for pageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m)), 6 shorting plugs, 2 lead separators 3.4 diameter, 4 banana post adapters, 6 colored rings, 4 white base rings and instructions for use. The long additions lead sets come pre-assembled with the white base ring and the banana post adapters. 1 kit = 1 sales unit.

Specifications

ECG Diagnostic ECG Patient Cables and Leads
ECG Diagnostic ECG Patient Cables and Leads
Patient Application
  • Child; Adult
Application Site
  • Limb; Chest
Lead Set Length
  • 48 in (1.22m)
Shielded
  • Shielded
Number of Leads
  • 16
Electrode Attachment Method
  • Alligator Clip
Color Coding
  • IEC
Product details
Product details
Use with Philips Healthcare Equipment
  • 860315, 860310
Use with Non-Philips Healthcare Equipment
  • No
Product Category
  • ECG
Product Type
  • Diagnostic ECG Patient Cables and Leads
CE Certified
  • Yes
Single-Patient Use OR Multi-Patient Use
  • Multi-Patient Use
Packaging Unit
  • 1
Not manufactured with natural rubber latex
  • Yes
Minimum Shelf Life
  • None
Sterile OR Non-Sterile
  • Non-Sterile
Use with Other Supplies
  • N/A
ECG Diagnostic ECG Patient Cables and Leads
ECG Diagnostic ECG Patient Cables and Leads
Patient Application
  • Child; Adult
Application Site
  • Limb; Chest
Product details
Product details
Use with Philips Healthcare Equipment
  • 860315, 860310
Use with Non-Philips Healthcare Equipment
  • No
See all specifications
ECG Diagnostic ECG Patient Cables and Leads
ECG Diagnostic ECG Patient Cables and Leads
Patient Application
  • Child; Adult
Application Site
  • Limb; Chest
Lead Set Length
  • 48 in (1.22m)
Shielded
  • Shielded
Number of Leads
  • 16
Electrode Attachment Method
  • Alligator Clip
Color Coding
  • IEC
Product details
Product details
Use with Philips Healthcare Equipment
  • 860315, 860310
Use with Non-Philips Healthcare Equipment
  • No
Product Category
  • ECG
Product Type
  • Diagnostic ECG Patient Cables and Leads
CE Certified
  • Yes
Single-Patient Use OR Multi-Patient Use
  • Multi-Patient Use
Packaging Unit
  • 1
Not manufactured with natural rubber latex
  • Yes
Minimum Shelf Life
  • None
Sterile OR Non-Sterile
  • Non-Sterile
Use with Other Supplies
  • N/A
  • Product may not be available in all geographies, please check with your Philips representative for complete portfolio availability.

You are about to visit a Philips global content page

Continue

You are about to visit a Philips global content page

Continue

Our site can best be viewed with the latest version of Microsoft Edge, Google Chrome or Firefox.

Vstupujete na českou webovou stránku Philips Healthcare
Please select the checkbox

Webová stránka je určena pouze osobám, které jsou odborníky (tj. osobám oprávněným zdravotnické prostředky předepisovat nebo vydávat), nebo zaměstnancům poskytovatele zdravotních služeb.

Jste osobou, která splňuje výše uvedená kritéria? Potvrzujete, že jste seznámeni s rizikem, že pokud budete pokračovat na tyto stránky, aniž jste osobou, která splňuje výše uvedená kritéria, hrozí, že informace tam obsažené budete nevhodně interpretovat a dojdete k mylným závěrům?